QUALITY ASSURANCE AND CONTROL PLAN.

QUALITY ASSURANCE PLAN

 

The prime objective of this plan is to assure the project performance in accordance to the contract specifications and details.

BASIC REFERENCES FOR THE QUALITY ASSURANCE PLAN

Contract specifications and Contract Drawings

CDFSD Standard Specifications

BS/NFPA codes of practice

Other relevant instructions by the consultants.

OPERATIONAL CLASSIFICATION AND REVIEW

Design review

Project Organisation review

Material review

Inspection and documentation

Tests and records

Design Review:


Design available is reviewed and optimized if required with the industry & local civil defense standards. Any type of technical conflicts will be notified and corrected prior to the installation

  • A true record of updates of the drawing shall be maintained.
  • Required  shop drawings shall be prepared and obtain Prior approval before construction

Materials Review

  • All the materials use in the project shall be complied to the project specifications and to the satisfaction and acceptance of the client.
  • All the materials will be proposed with adequate technical details and samples as far as possible, through an approved format of submittal. Consultant’s approval shall be taken prior to the procurement.

Inspection and approval Documentation: 

  • Each and every stage of activities of all sequence of the works will be offered for inspection to the consultant and the corrective instructions if any will be attended before mould to the permanent form.
  • Any other requirements of importance arise during the construction shall be taken up and offered for inspection.
  • Inspection request shall be produced in advance to the consultants, and the works detailing and specification compliance shall be reconfirmed with written approvals

Testing & Commissioning

  • All tests shall be offered to witness  by the consultant / client engineer and all test reports shall be maintained and registered for verification

SUMMARY PROFILE

  • Design, Supply , Installation , Testing & commissioning of Fire protection System ( Sprinkler, Wet Riser , Water/Foam Deluge , Fire Suppression etc)

  • Design, Supply , Installation , Testing & commissioning of Fire Alarm System

  • Design, Supply , Installation , Testing & commissioning of Gas Detection System

  • Supply & Application of Fire Proof Coating ( Luminescent & Contentious)

  • Staircase Pressurization System

  • Installation of Air Compression / Chill Water Piping.

  • Garbage Chute System

  • Linen Chute System

  • Over 20 years experience in the Kingdom of Bahrain

  • Complete range of services for turnkey projects

  • Total commitment to the client requirements

  • Highly Professional team

  • Fully equipped Workshops..

  • Access to a wide range of resources, assets, machinery, light & heavy equipment,